How do they put the paving slab with their own hands? Councils of Masters

Home cosiness

Today, paving slabs are affordable,so it is increasingly used for finishing tracks and grounds not only in front of offices, but also in its home garden. And the richness of the color palette and the variety of drawings make it possible to satisfy the most demanding consumer. Therefore, the question arises as to how the paving slab is laid. Today we are advised by real masters.

we lay paving tiles with our own hands

How to lay a sidewalk tile: take into account the features

Tiles can be of different types. The most common is a paving stone, which is a rectangle with a certain size. But there are also carved tiles, which in shape resemble a flower or a leaf. Laying tiles can be performed in many ways. However, the most common ones are most often used. Much less often the master puts the tile with herringbone or sticks. If you want to decorate your site, it is necessary to show some ingenuity and, using a tile of different colors, create a kind of picture on your pavement.

We lay the paving slab with our own hands. How to do it?

I put paving slab

This process is rather complicated and requires patience. After all, on how it will be laid, depends both its service life and appearance. If you are trying to save money on the tile, then you do not need to save money on it, because it costs you more. So, let's get to work. First, we remove the entire turf to the last root. This will help prevent cracking of the substrate of the tile and punching the grass through it. After this, you must perform a natural slope for the drainage of water. Then carefully tamper the bottom of the trench, having previously indicated the places where the curbs of your pavement will pass. After this, you need to lay out the curb and fill small gravel as a substrate. Why start with it? It's simple: it will prevent the whole structure from spreading and will indicate a clear boundary of the pavement itself. At the next stage, sand is poured, wetted and tamped, and the level is strictly observed. From above, you need to fill up the rubble, then the sand-cement mixture, which will tie the tile. The main thing is to keep the level, and then the foundation will be even, strong and durable.

how to lay a paving slab

So, I put the paving slab

The base is ready, we start laying the tiles. The very first row should be fixed with cement mortar, and the tile itself should be drowned strictly to a certain depth and level. If the even number is not obtained, you need to remove the sand or pour it, so that all the rows were ideal. It is necessary to remember that it is not enough to know how to lay a sidewalk tile, it is also necessary to follow all the rules. Therefore, remember that there should be small gaps between the rows in order to prevent water stagnation and allow it to escape into the ground. The master should be located on the side where the tile is already laid. This will help not to damage the aligned substrate. If you want to cut the material, then this will require a Bulgarian or a saw for metal. Fit such pieces only after the main work is completed. At the end, the tile is rolled with a large diameter roller and sprinkled with river sand. Then the sand is scattered with a brush. This is necessary in order to fill all the seams between the tiles.

Outcomes

Now we know how to put the paving slabcorrectly. Finally, let's talk about how to take care of it. If the color of the material is gray, special care is not required. But the colored tiles will have to be washed periodically, so that it retains an attractive appearance for many years.